Keep your headlights on, not compulsory but recommended!!!!!1st Nov 2004

pool fence.JPG (282729 bytes) The pool is now fenced to meet the new French Law requirements

TAX SEISURE STARTS 1 JULY 2004, 0.22E / night for over 11 and under 65 years old

The summer kitchen and pool house construction has now started, a sketch of the proposal pool house  sketch mod.jpg (250315 bytes) Foundations graham on digger best.JPG (182149 bytes) 500 mm wide, 500 mm deep mass concrete with 1m square steel frames under all legs.

  f2.JPG (349121 bytes)f7.JPG (332793 bytes) f5.JPG (319765 bytes) the walls are 200 wide concrete blocks, the slab has 12/20 gravel infill covered with damp proof membrane and 50mm heavy duty foundation insulation. The slab is 100mm thick with fiber reinforcing and keyed into the retaining walls.

ground floor slab team.JPG (165229 bytes)Pool house slab completed 30th Sept with friends and Guests!! 

and lunch followed slab team lunch.JPG (196677 bytes)   

  barn roof coming off.JPG (331331 bytes) the roof is off the old barn, with help from friendsdismantaling last two frames.JPG (344555 bytes)

New frames,new frames.JPG (206310 bytes) all my own work, no one to blame!!!  

a joint! new end frame corner joint.JPG (305689 bytes) The barn comes down dismantaling last two frames.JPG (344555 bytes) and the pool house goes up second frame up.JPG (295311 bytes), all frames up all frames up 2.JPG (166098 bytes) 12th Nov.

block walls complete.jpg (333313 bytes) The block walls are now complete (10th Jan) to a metre high, keyed into the timber legs on every joint. ready for timber walls to be built and then the roof in March Outer wood walls are started outer wood walls started.JPG (175583 bytes) All the main roof beams are now on with some joists main roof beams all on.JPG (176232 bytes) thanks to a lot of FRIENDS

View from the house with the barn gone view with barn down.JPG (128295 bytes)  the mountains are there! 

and work starts mum and pond.JPG (433502 bytes) on the extra garden space to be complete for May. The new lawn starts as 30 tonne of top soil mum cascade and pile of top soil.JPG (373542 bytes) and Gaynor is building the 'Cascade'. The lawn is now leveled and seeded, you can see the Pyrenees, new lawn no pile.JPG (176173 bytes) honest and the new sitting area progresses bank planted.JPG (345082 bytes) with the grass.pond is getting there.JPG (351881 bytes)

The pool house is progressing well as friends have helped a lot

roof all joists up 2.JPG (193488 bytes) roof all joists up.JPG (178876 bytes) roof joists up.JPG (175013 bytes)  

April 2005 roof ready for tiles.JPG (208016 bytes) roof ready for tiles 2.JPG (166831 bytes) roof one side tiled.jpg (290156 bytes) roof front part done.JPG (211006 bytes) west wood wall up.JPG (313617 bytes) April 29th Roof complete, due to a lot of help from some great FRIENDS roof front complete.JPG (167726 bytes) roof rear and hip complete.JPG (182622 bytes) THANKS AGAIN TO YOU ALL

The roof is fully insulated with aluminum polystyrene sheet (equal to 200mm glass fiber), there is a 40mm gap to the tiles for air circulation and the ridge tiles are ventilated

We start the internals, first the ceiling which is a PVC paneling with 80mm gap to the insulation gaynor and carolina ceiling.JPG (189296 bytes) ceiling finished.JPG (219457 bytes) finished may 21st, 

what a job for access! and now the 200mm glass fiber insulation goes in the walls wall insulation.JPG (176798 bytes) kitchen ceiling and insulation.JPG (221162 bytes) 

We have a PARTY!!!!!!!!!!!!band.JPG (179044 bytes)

And work starts again, with the pool surround now pool suround.JPG (297144 bytes) and the helpers enjoy a well earned swim

Well after a busy summer and a flight from the horse we are now into build mode again Carl and Gaynor setting the butterfly blocks.JPG (700795 bytes) ( No free lunch for the brother in law! )  brian, pat and will l;aying screed.JPG (737357 bytes)  and you need friends, the floor butterfly is finished buterfly finished.JPG (681602 bytes) next we complete the kitchen kitchen door in and wall finished.JPG (626748 bytes) outside is complete outside complete mod.jpg (364209 bytes) and we are on with the inside first inside wall panel.JPG (140287 bytes)

The summer kitchen is completed Feb 2006 summer kitchen 2.jpg (837223 bytes) and we have started the amenities pool house ameneties started.jpg (982097 bytes) ( Shower, toilet, sauna and hammam ) all are now complete july 2006!!!!!

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The Pool house will provide both a sun shade terrace, summer kitchen, shower, gym, sauna, hammam, play area for ping pong etc and a place to use the Jacuzzi in the winter months! on the ground floor and a mezzanine floor to relax and look straight down the valley to the Pyrenees with excellent viewing for wildlife. 

The works also give a bigger patio area for the pool with part in the shade.

The program 'is' main slab end sept. COMPLETED WITH FRIENDS. Frame of building oct ( delayed due to extra guests) , walls nov, roof dec COMPLETED end APRIL, internals spring 2005. well that was the plan! B!!!!! horse

horizontal rule

House hunters

A very high percentage have brought locally after staying with us, they include Russians, Germans, Dutch and English.

Recent Comments on the 'La Riberre'

Sorry about any I have missed!!!! NONE WERE BAD!!!!!!!!!!!( and this is only to show how pleased people have been, not a competition! or anything else)

Tony & Alyson Tonge with 3 year old Caitlin stayed for two weeks and did not want to go, brought all sorts and dinner! This showed how good a family gite we have.

"This is more of a hobby than a business for you isn't it" Andy & Wendy (And Junior) Hayes, the Blade riders!!!! (this is meant in a similar manner to others, we offer more for less!)

'You are very cheep ( Price wise!!) our friends do not believe it.' Michael visiting Lourdes with his wife Marion and friend Margaret for the Spiritual benefits.( Our aim is to provide the best value in the area) They left dog biscuits and souvenirs of there homeland, Scotland. We did not realise that this read like 'GIVE US A PRES!!!' sorry to any offence. Sent us some ideas to help handicapped folk, much appreciated.

'Many thanks' and presented us with a beautiful painting of our house  Vera Parker ( sorry about the wrong spelling before) after buying her house to live in Trie.

'Great support in house hunting'    Alison Hunter after buying a local shop to start reflexology in Trie

'The beauty of the La Riberre is that it is not run as a business' Mr & Mrs Doug and Sheila Whyles, Oct 2003 Drink and flowers.

'Many thanks for the kindness and hospitality' Rona, Bill & John Grantham Oct 2003, white rose

Post card from M & mme Carceller

'You lucky ********' Norman Down July 2003

'Wonderful time, with hosts who are 'tres gentile'' French Antin wedding party, Marie, Pierre et Nicolas Vicart, M & Mme Flechel July 2003

'I did not know the English were so cheerful' M & MMe Lacroze and friends for Mirande july 2003, provided desert and wine!!! 

Took us to dinner at their house!!! Stewart and Cathy Parkes March 2003

'Its wonderful' my mum!!! May 2003,Oct 2003 

A sitting garden will be built where the barn is now, probably Autumn 2005